How to Price a Furnace Replacement
Price a furnace from your hours and the whole job, not just the box. A move to a high-efficiency furnace adds a new vent and a drain, so price it as its own choice.
Price the whole swap, not the box
Take your hours times your rate, then add the furnace and every part the job needs. The furnace is only one line. The vent, the drain, the gas, the duct fit and the permit are the rest.
Most swaps fit in 1 day for a crew of 2. Time your own jobs for a few weeks. Your real hours beat any chart you find online.
Plan on 4 to 6 hours for a like-for-like swap
A swap to the same kind of furnace often takes 4 to 6 hours. A move to a high-efficiency one often takes 6 to 10. These are rough. The house and the access decide the real number.
Walk the job before you quote. Look for the things that eat time:
- Where the furnace sits: a basement, a closet, a crawl space or an attic.
- How the old one vents, and where a new vent could go out.
- The size of the gas line and the shape of the ducts at the furnace.
- If the AC coil sits on top and has to come off and go back.
- How you get the old unit out and the new one in.
Size the new furnace from a load calculation, not the old label. It is the standard way to work out how much heat the house loses. Many old furnaces are bigger than the house needs.
A high-efficiency furnace needs a new vent and a drain
Furnaces are rated by AFUE. That is the share of the gas that turns into heat in the house. A standard furnace is about 80%. A high-efficiency one is 90% or more.
A switch from 80% to 90% or more is a vent job, not just a swap. The new furnace vents out a side wall or the roof in plastic pipe. It also makes water as it runs, so it needs a drain.
- Vent: new plastic pipe to the outside, sized and run by the maker's manual.
- Drain: a drain line to a floor drain, or a small pump to move the water.
- Water heater: if it shared the old chimney, it may now need a liner or its own vent. Check your local code.
A federal rule says most gas furnaces built after late 2028 must be 95% or more. The rule is back in court, and the date may move. Check where it stands before you tell a customer.
A worked example with 2 choices
Here is one way the numbers can add up. Every figure is an example. Swap in your own rate and your supplier's prices.
Say your rate is $130 an hour. It has to cover your pay, the truck, gas, insurance, tools and the office. The job is an old 80% furnace in a basement.
Choice 1, a new 80% furnace in the same spot:
- Labor: 6 hours at $130, $780.
- Furnace: your price to the customer, $1,900.
- Parts: duct fit, gas hookup, vent pipe and wire, $250.
- Old unit out: haul it away, $75.
- Permit: passed through at cost, $125.
That comes to about $3,130 for the swap.
Choice 2, a 96% furnace: 9 hours of labor is $1,170. The furnace might be $2,800, and the vent and drain $350. With the same parts, haul away and permit, that comes to about $4,770.
The extras that change the price
Look at the whole job before you quote. Each of these adds time or parts, so each one is fair to price.
- A chimney liner: for a water heater left alone in the old chimney.
- A drain pump: when there is no floor drain close by.
- A bigger gas line: when the new furnace needs more gas than the old line can carry.
- Duct changes: a new box where the furnace meets the ducts, or a fix for a weak return.
- A hard spot: an attic, a crawl space or a tight closet adds hours.
- A new thermostat: some furnaces need their own, or a new wire to run it.
- The AC coil: if it sits on the furnace, it may need to come off and go back on.
Many places want a carbon monoxide alarm when you put in a gas furnace. The rules vary, so check yours.
Show it on the quote as a few clear lines
Give 2 or 3 real choices, each a full job with its own total. For example, an 80% furnace, a 96% furnace, or a 96% furnace with a new thermostat. The customer picks what fits the home and the budget.
Keep each choice to a few lines:
- Equipment: the furnace, with the maker's warranty.
- Install: the labor, the duct fit and the gas hookup.
- Vent and drain: the new vent, the drain and any liner.
- Permit and old unit: the permit, and the old unit hauled away.
Then say what is not included. For example: a new AC, new ducts, patching walls or a panel upgrade. Each one can be its own quote.
The federal tax credit for furnaces ended for units put in after 2025. Some gas and power companies still pay rebates. Check yours before you mention one.
Keep each furnace, each part and your vent price in your price book. Then the next furnace takes a few minutes to quote.
Fair questions
- Should I quote a new AC with the furnace?
- Offer it as its own choice when the AC is near the end of its life. Doing both at once saves a trip and lets the parts match. Let the customer pick.
- Do I need a permit to replace a furnace?
- In most places, yes. Many towns want a mechanical permit, and some want a gas permit too. Call your local office to be sure.
- Can I reuse the old vent?
- Only for a furnace of the same kind, and only if the old vent is sound and the right size. A high-efficiency furnace always needs its own plastic vent. Follow the maker's manual.