How to Price Handyman Work: By the Hour or By the Job
Charge a flat price for the jobs you know well, and by the hour for the ones you cannot see into. Both start from your own hourly rate and a minimum charge.
Flat price for jobs you know, the hour for jobs you cannot see
Quote a flat price when you know how long the job takes. Charge by the hour when you cannot tell. A flat price is one total for the whole job, set before you start.
Hanging a TV or swapping a door knob is a job you have done 100 times. Give it a flat price. A leak behind a wall or rot under a floor could be 1 hour or 6. Charge for the time.
Both ways start from the same place: your own hourly rate.
Set your hourly rate before you set a single price
Your rate has to pay you, and run the business. That means the truck, gas, tools, insurance and the time you spend on the phone.
Many shops land somewhere from $60 to $125 an hour. Where you sit depends on your area, your skill and your costs. Those numbers are only a guide, so work out your own.
Then add a minimum charge. It is the least you will take for any visit, often 1 to 2 hours of time. A 15 minute job still costs you the drive, so never price a visit below your minimum.
Turn your hours into flat prices for the jobs you repeat
Time your common jobs for a few weeks. Write down how long each one takes, from the truck to the truck.
Then set a flat price for each one: the hours times your rate, plus parts. Round up a little for the job that goes wrong.
Customers like a flat price. They know the cost before you start, and they do not watch the clock. And when you get faster, you keep the time you save.
Keep these prices in your price book. Then a call for a TV mount or a new faucet is quick to quote.
A worked example for a list of small jobs
Here is one way the numbers can add up. Every figure is an example. Swap in your own rate and your supplier's prices.
Say Ruth Pearson calls with a list. Your rate is $85 an hour, and your minimum is 2 hours.
- Hang 3 shelves: 1 hour, $85, plus $30 for brackets and anchors.
- Patch a hole in the wall: 1 hour over 2 trips, so the mud can dry, $85, plus $15 for mud and paint.
- Fix a door that sticks: 0.5 hours, $43.
- Caulk the tub: 0.5 hours, $43, plus $10 for caulk.
That is 3 hours of work and $55 of parts. The patch needs a second trip, so add 0.5 hours for the drive, $43. That comes to about $354 for the list.
Price the parts at what you charge, not what you paid. Your time to buy them and haul them counts too.
Know what changes the price before you quote it
Look at the job before you give a firm price. Each of these adds time or cost.
- A second trip: mud, paint and glue need time to dry.
- Ladders and high spots: tall ceilings and stairs slow you down.
- Old homes: walls that are not square, and paint that may have lead in it.
- Parts the customer bought: the wrong size means a run to the store.
- Hauling it away: old fixtures, boards and boxes take time to dump.
- Nights and weekends: many shops charge more after hours.
Know where your license stops, too. In many places, gas, wiring and big plumbing jobs need a licensed pro. Some states also cap the size of a job you can take without a license. In California, for example, it is under $1,000 with no permit needed. Check the rules where you work.
Show it on the quote as a few clear lines
Put each job on its own line, with its own price. Then the customer can see what they pay for, and drop a line if they want.
- Job lines: one per task, with a short note on what you will do.
- Parts: on each job line, or as one line for the whole list.
- Hourly work: your rate and your best guess at the hours, and a cap. You call before you go over it.
Then say what is not included. For example: paint for a whole wall, hidden rot, or wiring you find behind the wall. Each one can be its own quote.
Ask the customer to say yes to the quote before you start. Then ask them to pay before you leave.
Fair questions
- Should I charge a trip fee on top of my rate?
- You can, but a minimum charge is simpler. It covers the drive and the setup in one price. Either way, tell the customer up front.
- What if a flat price job takes longer than I thought?
- Keep your word on that job. Then fix the price in your book so the next one pays. If you find a new problem, stop and quote it as its own line.
- How do I price a long list of small jobs?
- Add up the hours for each task and price the list as one visit. Then you do not charge a minimum on every task. Fill a half day or a full day when you can.